Print Page | Close Window

Test Methodology

Printed From: One Stop Testing
Category: Types Of Software Testing @ OneStopTesting
Forum Name: Manual Testing @ OneStopTesting
Forum Discription: Discuss All that is need to be known about Manual Software Testing and its Tools.
URL: http://forum.onestoptesting.com/forum_posts.asp?TID=3348
Printed Date: 12Jul2025 at 2:45pm


Topic: Test Methodology
Posted By: tanushree
Subject: Test Methodology
Date Posted: 27Oct2007 at 5:11am
Test Methodology: It is a project level document and developed by QA or PM. It is a refinement form of Test Strategy. To prepare test methodology , QA or PM depends on below factors.
  • Step1 :
  • Determine project type such as Traditional, Out sourcing and Maintanence (depends on project type QA decreases no of columns in TRM)
    manual-testing
  • Step 2 :
  • Determine application requirements (depends on application requirements QA will decrease no of rows in TRM)
  • Step 3:
  • Determine tactical risks (depends on risks, QA decrease no of factors in selected list)
  • Step 4:
  • Determine scope of application (depends on expected future enhancements, QA add some of the deleted factors to TRM)
  • Step 5 :
  • Finalize TRM for current project
  • Step 6 :
  • Prepare system test plan (defining scheduling for above finalized approach)---Test Lead will do
  • Step 7 :
  • Prepare module test plans if require



Print Page | Close Window