Acceptance Test Plan {ATP}
Printed From: One Stop Testing
Category: Software Testing @ OneStopTesting
Forum Name: Test Plans @ OneStopTesting
Forum Discription: Discuss, Learn and Prepare better and better Test Plans for yourself.
URL: http://forum.onestoptesting.com/forum_posts.asp?TID=2864
Printed Date: 24Dec2024 at 12:50am
Topic: Acceptance Test Plan {ATP}
Posted By: tanushree
Subject: Acceptance Test Plan {ATP}
Date Posted: 15Oct2007 at 4:14am
Acceptance Test Plan {ATP} The
client at their place performs the acceptance testing. It will be very
similar to the system test performed by the Software Development Unit.
Since the client is the one who decides the format and testing methods
as part of acceptance testing, there is no specific clue on the way
they will carry out the testing. But it will not differ much from the
system testing. Assume that all the rules, which are applicable to
system test, can be implemented to acceptance testing also.
A sample Test Plan Outline along with their description is as shown below:
Test Plan Outline 1. BACKGROUND – This item summarizes the functions of the application system and the tests to be performed. 2. INTRODUCTION 3. ASSUMPTIONS – Indicates any anticipated assumptions which will be made while testing the application. 4. TEST ITEMS - List each of the items (programs) to be tested. 5. FEATURES
TO BE TESTED - List each of the features (functions or requirements)
which will be tested or demonstrated by the test. 6. FEATURES NOT TO BE TESTED - Explicitly lists each feature, function, or requirement which won't be tested and why not. 7. APPROACH - Describe the data flows and test philosophy. Simulation
or Live execution, Etc. This section also mentions all the approaches
which will be followed at the various stages of the test execution. 8. ITEM PASS/FAIL CRITERIA Blanket statement - Itemized list of expected output and tolerances 9. SUSPENSION/RESUMPTION CRITERIA - Must the test run from start to completion? Under what circumstances it may be resumed in the middle? Establish check-points in long tests. 10. TEST DELIVERABLES - What, besides software, will be delivered? Test report Test software 11. TESTING TASKS Functional tasks (e.g., equipment set up) Administrative tasks 12. ENVIRONMENTAL NEEDS Security clearance Office space & equipment Hardware/software requirements 13. RESPONSIBILITIES Who does the tasks in Section 10? What does the user do? 14. STAFFING & TRAINING 15. SCHEDULE 16. RESOURCES 17. RISKS & CONTINGENCIES 18. APPROVALS The
schedule details of the various test pass such as Unit tests,
Integration tests, System Tests should be clearly mentioned along with
the estimated efforts.
|
|