Print Page | Close Window

bottleneck

Printed From: One Stop Testing
Category: Types Of Software Testing @ OneStopTesting
Forum Name: Manual Testing @ OneStopTesting
Forum Discription: Discuss All that is need to be known about Manual Software Testing and its Tools.
URL: http://forum.onestoptesting.com/forum_posts.asp?TID=3503
Printed Date: 26Jun2024 at 8:49pm


Topic: bottleneck
Posted By: hemajose
Subject: bottleneck
Date Posted: 01Nov2007 at 2:03am
hi to all,
   Consider 10 testcases for a task. The tester test the first 4 testcases, and their status was pass, the next three testcases are fail. In the meanwhile bottleneck arises. How the test engineer report to the team
i) 4 testcases passed
ii) the last 3 are not completed so all are fail
iii)all testcases are failed
Iv)3 testcases are failed
What is the comment



Replies:
Posted By: abhwagh
Date Posted: 16Nov2007 at 1:36am
4 test cases as passed

-------------
Abhay Wagh


Posted By: abhwagh
Date Posted: 16Nov2007 at 1:36am
4 test cases are passed

-------------
Abhay Wagh


Posted By: venu199
Date Posted: 22Nov2007 at 6:57am
i want 3+ years QTP resume

-------------
venu



Print Page | Close Window