Testing Prioritized Requirements
Printed From: One Stop Testing
Category: Quality Assurance @ OneStopTesting
Forum Name: Requirements and Design Documents @ OneStopTesting
Forum Discription: All those Artifacts generated in Requirement and Design Phases like Use Cases, SRS, Functional & Non-Functional Specefications, Check Lists, Design Documentations etc.
URL: http://forum.onestoptesting.com/forum_posts.asp?TID=1283
Printed Date: 26Dec2024 at 12:49am
Topic: Testing Prioritized Requirements
Posted By: Sanjita
Subject: Testing Prioritized Requirements
Date Posted: 07May2007 at 4:09am
So I'm curious how QA's test plan is impacted on a project with prioritized requirements. With this priority scale, I'm thinking of the following:
1. All test cases which validate the "Must Have" requirements will be executed first and any bugs found will have a higher priority rating than the bugs related to "Highly Desirable" requirements.
2. All test cases which validate the "Highly Desireable" requirements will be executed second and any bugs found will have a lower priority rating than the bugs related to "Must Have" requirements until all "Must Have" bugs have been resolved.
3. If any "Future Enhancement" requirements are implemented in the design, these test cases will be executed last. Any bugs found will have a lower priority rating than the bugs related to "Must Have" or "Highly Desireable" requirements until all "Must Have" or "Highly Desireable" bugs have been resolved.
|
|