Performance testing in general terms is testing
that is performed, from one perspective, to determine how fast some
aspect of a system performs under a particular workload. It can also
serve to validate and verify other quality attributes of the system,
such as scalability, reliability and resource usage. Performance
testing is a subset of Performance Engineering, an emerging computer
science practice that strives to build performance into the design and
architecture of a system, prior to the onset of actual coding effort.
Performance testing can serve different purposes. It can
demonstrate that the system meets performance criteria. It can compare
two systems to find which performs better. Or it can measure what parts
of the system or workload cause the system to perform badly. In the
diagnostic case, software engineers use tools such as profilers to
measure what parts of a device or software contribute most to the poor
performance or to establish throughput levels (and thresholds) for
maintained acceptable response time. It is critical to the cost
performance of a new system, which performance test efforts begin at
the inception of the development project and extend through to
deployment. The later a performance defect is detected, the higher the
cost of remediation. This is true in the case of functional testing,
but even more so with performance testing, due to the end-to-end nature
of its scope.
In performance testing, it is often crucial (and often difficult to
arrange) for the test conditions to be similar to the expected actual
use. This is, however, not entirely possible in actual practice. The
reason is that production systems have a random nature of the workload
and while the test workloads do their best to mimic what may happen in
the production environment, it is impossible to exactly replicate this
workload variability - except in the simplest system.
Loosely coupled architectural implementations (e.g.: http://en.wikipedia.org/wiki/SOA//oSOA - SOA )
have created additional complexities with performance testing.
Enterprise services or assets (that share common infrastructure or
platform) require coordinated performance testing (with all consumers
creating production-like transaction volumes and load on shared
infrastructures or platforms) to truly replicate production-like
states. Due to the complexity and financial and time requirements
around this activity, some organizations now employ tools that can
monitor and create production-like conditions (also referred as
"noise") in their performance testing environments ( http://en.wikipedia.org/wiki/PTE//oPTE - PTE ) to understand capacity and resource requirements and verify / validate quality attributes.
To sum up above discussion, Performance testing is
a type of testing intended to determine the responsiveness, throughput,
reliability, and/or scalability of a system under a given workload.
Performance testing is commonly conducted to accomplish the following:
* Assess production readiness
* Evaluate against performance criteria
* Compare performance characteristics of multiple systems or system configurations
* Find the source of performance problems
* Support system tuning
* Find throughput levels
Performance Testing: its Core Activities
Performance testing is typically done to help identify bottlenecks
in a system, establish a baseline for future testing, support a
performance tuning effort, determine compliance with performance goals
and requirements, and/or collect other performance-related data to help
stakeholders make informed decisions related to the overall quality of
the application being tested. In addition, the results from performance
testing and analysis can help you to estimate the hardware
configuration required to support the application(s) when you "go live"
to production operation.
The performance testing approach consists of the following activities:
1. Activity 1. Identify the Test Environment. Identify
the physical test environment and the production environment as well as
the tools and resources available to the test team. The physical
environment includes hardware, software, and network configurations.
Having a thorough understanding of the entire test environment at the
outset enables more efficient test design and planning and helps you
identify testing challenges early in the project. In some situations,
this process must be revisited periodically throughout the projectŮs
life cycle.
2. Activity 2. Identify Performance Acceptance Criteria. Identify
the response time, throughput, and resource utilization goals and
constraints. In general, response time is a user concern, throughput is
a business concern, and resource utilization is a system concern.
Additionally, identify project success criteria that may not be
captured by those goals and constraints; for example, using performance
tests to evaluate what combination of configuration settings will
result in the most desirable performance characteristics.
3. Activity 3. Plan and Design Tests. Identify
key scenarios, determine variability among representative users and how
to simulate that variability, define test data, and establish metrics
to be collected. Consolidate this information into one or more models
of system usage to be implemented, executed, and analyzed.
4. Activity 4. Configure the Test Environment. Prepare
the test environment, tools, and resources necessary to execute each
strategy as features and components become available for test. Ensure
that the test environment is instrumented for resource monitoring as
necessary.
5. Activity 5. Implement the Test Design. Develop the performance tests in accordance with the test design.
6. Activity 6. Execute the Test. Run and monitor your tests. Validate
the tests, test data, and results collection. Execute validated tests
for analysis while monitoring the test and the test environment.
7. Activity 7. Analyze Results, Report, and Retest. Consolidate
and share results data. Analyze the data both individually and as a
cross-functional team. Reprioritize the remaining tests and re-execute
them as needed. When all of the metric values are within accepted
limits, none of the set thresholds have been violated, and all of the
desired information has been collected, you have finished testing that
particular scenario on that particular configuration.
The Significance of Performance Testing
At the highest level, performance testing is almost always
conducted to address one or more risks related to expense, opportunity
costs, continuity, and/or corporate reputation. Some more specific
reasons for conducting performance testing include:
* Assessing release readiness by:
o Enabling you to predict or estimate the performance
characteristics of an application in production and evaluate whether or
not to address performance concerns based on those predictions. These
predictions are also valuable to the stakeholders who make decisions
about whether an application is ready for release or capable of
handling future growth, or whether it requires a performance
improvement/hardware upgrade prior to release.
o Providing data indicating the likelihood of user dissatisfaction with the performance characteristics of the system.
o Providing data to aid in the prediction of revenue losses or
damaged brand credibility due to scalability or stability issues, or
due to users being dissatisfied with application response time.
* Assessing infrastructure adequacy by:
o Evaluating the adequacy of current capacity. o Determining the acceptability of stability.
o Determining the capacity of the applicationŮs infrastructure, as
well as determining the future resources required to deliver acceptable
application performance.
o Comparing different system configurations to determine which works best for both the application and the business.
o Verifying that the application exhibits the desired performance
characteristics, within budgeted resource utilization constraints.
* Assessing adequacy of developed software performance by:
o Determining the applicationŮs desired performance characteristics before and after changes to the software.
o Providing comparisons between the applicationsŮs current and desired performance characteristics.
* Improving the efficiency of performance tuning by:
o Analyzing the behavior of the application at various load levels.
o Identifying bottlenecks in the application.
o Providing information related to the speed, scalability, and
stability of a product prior to production release, thus enabling you
to make informed decisions about whether and when to tune the system.
Parameters for a successful Performance Testing Project
For a performance-testing project to be successful, both the
approach to testing performance and the testing itself must be relevant
to the context of the project. Without an understanding of the project
context, performance testing is bound to focus on only those items that
the performance tester or test team assumes to be important, as opposed
to those that truly are important, frequently leading to wasted time,
frustration, and conflicts.
The project context is nothing more than those things that are, or
may become, relevant to achieving project success. This may include,
but is not limited to:
* The overall vision or intent of the project
* Performance testing objectives
* Performance success criteria
* The development life cycle
* The project schedule
* The project budget
* Available tools and environments
* The skill set of the performance tester and the team
* The priority of detected performance concerns
* The business impact of deploying an application that performs poorly
Some examples of items that may be relevant to the performance-testing effort in your project context include:
* Project vision. Before beginning performance
testing, ensure that you understand the current project vision. The
project vision is the foundation for determining what performance
testing is necessary and valuable. Revisit the vision regularly, as it
has the potential to change as well.
* Purpose of the system. Understand the purpose of
the application or system you are testing. This will help you identify
the highest-priority performance characteristics on which you should
focus your testing. You will need to know the systemŮs intent, the
actual hardware and software architecture deployed, and the
characteristics of the typical end user.
* Customer or user expectations. Keep customer or
user expectations in mind when planning performance testing. Remember
that customer or user satisfaction is based on expectations, not simply
compliance with explicitly stated requirements.
* Business drivers. Understand the business drivers
– such as business needs or opportunities – that are constrained to
some degree by budget, schedule, and/or resources. It is important to
meet your business requirements on time and within the available budget.
* Reasons for testing performance. Understand the
reasons for conducting performance testing very early in the project.
Failing to do so might lead to ineffective performance testing. These
reasons often go beyond a list of performance acceptance criteria and
are bound to change or shift priority as the project progresses, so
revisit them regularly as you and your team learn more about the
application, its performance, and the customer or user.
* Value that performance testing brings to the project.
Understand the value that performance testing is expected to bring to
the project by translating the project- and business-level objectives
into specific, identifiable, and manageable performance testing
activities. Coordinate and prioritize these activities to determine
which performance testing activities are likely to add value.
* Project management and staffing. Understand the
teamŮs organization, operation, and communication techniques in order
to conduct performance testing effectively.
* Process. Understand your teamŮs process and
interpret how that process applies to performance testing. If the
teamŮs process documentation does not address performance testing
directly, extrapolate the document to include performance testing to
the best of your ability, and then get the revised document approved by
the project manager and/or process engineer.
* Compliance criteria. Understand the regulatory
requirements related to your project. Obtain compliance documents to
ensure that you have the specific language and context of any statement
related to testing, as this information is critical to determining
compliance tests and ensuring a compliant product. Also understand that
the nature of performance testing makes it virtually impossible to
follow the same processes that have been developed for functional
testing.
* Project schedule. Be aware of the project start
and end dates, the hardware and environment availability dates, the
flow of builds and releases, and any checkpoints and milestones in the
project schedule.
How are Performance Testing and Performance Tuning Related?
When end-to-end performance testing reveals system or application
characteristics that are deemed unacceptable, many teams shift their
focus from performance testing to performance tuning, to discover what
is necessary to make the application perform acceptably. A team may
also shift its focus to tuning when performance criteria have been met
but the team wants to reduce the amount of resources being used in
order to increase platform headroom, decrease the volume of hardware
needed, and/or further improve system performance.
Cooperative Effort
Although tuning is not the direct responsibility of most performance
testers, the tuning process is most effective when it is a cooperative
effort between all of those concerned with the application or system
under test, including:
* Product vendors
* Architects
* Developers
* Testers
* Database administrators
* System administrators
* Network administrators
Without the cooperation of a cross-functional team, it is almost
impossible to gain the system-wide perspective necessary to resolve
performance issues effectively or efficiently.
The performance tester, or performance testing team, is a critical
component of this cooperative team as tuning typically requires
additional monitoring of components, resources, and response times
under a variety of load conditions and configurations. Generally
speaking, it is the performance tester who has the tools and expertise
to provide this information in an efficient manner, making the
performance tester the enabler for tuning.
Overview of the Performance Tuning Process
Tuning follows an iterative process that is usually separate from,
but not independent of, the performance testing approach a project is
following. The following is a brief overview of a typical tuning
process:
* Tests are conducted with the system or application deployed in a
well-defined, controlled test environment in order to ensure that the
configuration and test results at the start of the testing process are
known and reproducible.
* When the tests reveal performance characteristics deemed to be
unacceptable, the performance testing and tuning team enters a
diagnosis and remediation stage (tuning) that will require changes to
be applied to the test environment and/or the application. It is not
uncommon to make temporary changes that are deliberately designed to
magnify an issue for diagnostic purposes, or to change the test
environment to see if such changes lead to better performance.
* The cooperative testing and tuning team is generally given full
and exclusive control over the test environment in order to maximize
the effectiveness of the tuning phase.
* Performance tests are executed, or re-executed after each change
to the test environment, in order to measure the impact of a remedial
change.
* The tuning process typically involves a rapid sequence of changes
and tests. This process can take exponentially more time if a
cooperative testing and tuning team is not fully available and
dedicated to this effort while in a tuning phase.
* When a tuning phase is complete, the test environment is generally
reset to its initial state, the successful remedial changes are applied
again, and any unsuccessful remedial changes (together with temporary
instrumentation and diagnostic changes) are discarded. The performance
test should then be repeated to prove that the correct changes have
been identified. It might also be the case that the test environment
itself is changed to reflect new expectations as to the minimal
required production environment. This is unusual, but a potential
outcome of the tuning effort.
Performance, Load, and Stress Testing
Performance tests are usually described as belonging to one of the following three categories:
* Performance testing. This type of testing
determines or validates the speed, scalability, and/or stability
characteristics of the system or application under test. Performance is
concerned with achieving response times, throughput, and
resource-utilization levels that meet the performance objectives for
the project or product. In this guide, performance testing represents
the superset of all of the other subcategories of performance-related
testing.
* Load testing. This subcategory of performance
testing is focused on determining or validating performance
characteristics of the system or application under test when subjected
to workloads and load volumes anticipated during production operations.
* Stress testing. This subcategory of performance
testing is focused on determining or validating performance
characteristics of the system or application under test when subjected
to conditions beyond those anticipated during production operations.
Stress tests may also include tests focused on determining or
validating performance characteristics of the system or application
under test when subjected to other stressful conditions, such as
limited memory, insufficient disk space, or server failure. These tests
are designed to determine under what conditions an application will
fail, how it will fail, and what indicators can be monitored to warn of
an impending failure.
Baselines
Creating a baseline is the process of running a set of tests to
capture performance metric data for the purpose of evaluating the
effectiveness of subsequent performance-improving changes to the system
or application. A critical aspect of a baseline is that all
characteristics and configuration options except those specifically
being varied for comparison must remain invariant. Once a part of the
system that is not intentionally being varied for comparison to the
baseline is changed, the baseline measurement is no longer a valid
basis for comparison.
With respect to Web applications, you can use a baseline to
determine whether performance is improving or declining and to find
deviations across different builds and versions. For example, you could
measure load time, the number of transactions processed per unit of
time, the number of Web pages served per unit of time, and resource
utilization such as memory usage and processor usage. Some
considerations about using baselines include:
* A baseline can be created for a system, component, or application. A baseline can also be created for different layers of the application, including a database, Web services, and so on.
* A baseline can set the standard for comparison, to track future optimizations or regressions.
It is important to validate that the baseline results are repeatable,
because considerable fluctuations may occur across test results due to
environment and workload characteristics.
* Baselines can help identify changes in performance.
Baselines can help product teams identify changes in performance that
reflect degradation or optimization over the course of the development
life cycle. Identifying these changes in comparison to a well-known
state or configuration often makes resolving performance issues simpler.
* Baselines assets should be reusable. Baselines
are most valuable if they are created by using a set of reusable test
assets. It is important that such tests accurately simulate repeatable
and actionable workload characteristics.
* Baselines are metrics. Baseline results can be
articulated by using a broad set of key performance indicators,
including response time, processor capacity, memory usage, disk
capacity, and network bandwidth.
* Baselines act as a shared frame of reference.
Sharing baseline results allows your team to build a common store of
acquired knowledge about the performance characteristics of an
application or component.
* Avoid over-generalizing your baselines. If your
project entails a major reengineering of the application, you need to
reestablish the baseline for testing that application. A baseline is
application-specific and is most useful for comparing performance
across different versions. Sometimes, subsequent versions of an
application are so different that previous baselines are no longer
valid for comparisons.
* Know your applicationŮs behavior. It is a good
idea to ensure that you completely understand the behavior of the
application at the time a baseline is created. Failure to do so before
making changes to the system with a focus on optimization objectives is
frequently counterproductive.
* Baselines evolve. At times you will have to
redefine your baseline because of changes that have been made to the
system since the time the baseline was initially captured.
Benchmarking
Benchmarking is the process of comparing your systemŮs performance
against a baseline that you have created internally or against an
industry standard endorsed by some other organization.
In the case of a Web application, you would run a set of tests that
comply with the specifications of an industry benchmark in order to
capture the performance metrics necessary to determine your
applicationŮs benchmark score. You can then compare your application
against other systems or applications that also calculated their score
for the same benchmark. You may choose to tune your application
performance to achieve or surpass a certain benchmark score. Some
considerations about benchmarking include:
* You need to play by the rules. A benchmark is
achieved by working with industry specifications or by porting an
existing implementation to meet such standards. Benchmarking entails
identifying all of the necessary components that will run together, the
market where the product exists, and the specific metrics to be
measured.
* Because you play by the rules, you can be transparent.
Benchmarking results can be published to the outside world. Since your
competitors may produce comparisons, you will want to employ a strict
set of standard approaches for testing and data to ensure reliable
results.
* You divulge results across various metrics. Performance
metrics may involve load time, number of transactions processed per
unit of time, Web pages accessed per unit of time, processor usage,
memory usage, search times, and so on.
Terminology
These terms and definitions are consistent with formal use and
industry standards; however, some of these terms are known to have
certain valid alternate definitions and implications in specific
industries and organizations. Keep in mind that these definitions are
intended to aid communication and are not an attempt to create a
universal standard.
Capacity |
The capacity of a system is the total workload it can handle without
violating predetermined key performance acceptance criteria. |
Capacity test |
A capacity test complements load testing by determining
your serverŮs ultimate failure point, whereas load testing monitors
results at various levels of load and traffic patterns. You perform
capacity testing in conjunction with capacity planning, which you use
to plan for future growth, such as an increased user base or increased
volume of data. For example, to accommodate future loads, you need to
know how many additional resources (such as processor capacity, memory
usage, disk capacity, or network bandwidth) are necessary to support
future usage levels. Capacity testing helps you to identify a scaling
strategy in order to determine whether you should scale up or scale out. |
Component test |
A component test is any performance test that targets an
architectural component of the application. Commonly tested components
include servers, databases, networks, firewalls, and storage devices. |
Endurance test |
An endurance test is a type of performance test focused on
determining or validating performance characteristics of the product
under test when subjected to workload models and load volumes
anticipated during production operations over an extended period of
time. Endurance testing is a subset of load testing. |
Investigation |
Investigation is an activity based on
collecting information related to the speed, scalability, and/or
stability characteristics of the product under test that may have value
in determining or improving product quality. Investigation is
frequently employed to prove or disprove hypotheses regarding the root
cause of one or more observed performance issues. |
Latency |
Latency is a measure of
responsiveness that represents the time it takes to complete the
execution of a request. Latency may also represent the sum of several
latencies or subtasks. |
Metrics |
Metrics are measurements obtained by
running performance tests as expressed on a commonly understood scale.
Some metrics commonly obtained through performance tests include
processor utilization over time and memory usage by load. |
Performance |
Performance refers to information regarding your applicationŮs response times, throughput, and resource utilization levels. |
Performance test |
A performance test is a technical investigation done to
determine or validate the speed, scalability, and/or stability
characteristics of the product under test. Performance testing is the
superset containing all other subcategories of performance testing
described in this chapter. |
Performance budgets or allocations |
Performance budgets (or allocations) are constraints placed on developers regarding allowable resource consumption for their component. |
Performance goals |
Performance goals are the criteria
that your team wants to meet before product release, although these
criteria may be negotiable under certain circumstances. For example, if
a response time goal of three seconds is set for a particular
transaction but the actual response time is 3.3 seconds, it is likely
that the stakeholders will choose to release the application and defer
performance tuning of that transaction for a future release. |
Performance objectives |
Performance objectives are usually
specified in terms of response times, throughput (transactions per
second), and resource-utilization levels and typically focus on metrics
that can be directly related to user satisfaction. |
Performance requirements |
Performance requirements are those
criteria that are absolutely non-negotiable due to contractual
obligations, service level agreements (SLAs), or fixed business needs.
Any performance criterion that will not unquestionably lead to a
decision to delay a release until the criterion passes is not
absolutely required ? and therefore, not a requirement. |
Performance targets |
Performance targets are the desired
values for the metrics identified for your project under a particular
set of conditions, usually specified in terms of response time,
throughput, and resource-utilization levels. Resource-utilization
levels include the amount of processor capacity, memory, disk I/O, and
network I/O that your application consumes. Performance targets
typically equate to project goals. |
Performance testing objectives |
Performance testing objectives refer
to data collected through the performance-testing process that is
anticipated to have value in determining or improving product quality.
However, these objectives are not necessarily quantitative or directly
related to a performance requirement, goal, or stated quality of
service (QoS) specification. |
Performance thresholds |
Performance thresholds are the
maximum acceptable values for the metrics identified for your project,
usually specified in terms of response time, throughput (transactions
per second), and resource-utilization levels. Resource-utilization
levels include the amount of processor capacity, memory, disk I/O, and
network I/O that your application consumes. Performance thresholds
typically equate to requirements. |
Resource utilization |
Resource utilization is the cost of
the project in terms of system resources. The primary resources are
processor, memory, disk I/O, and network I/O. |
Response time |
Response time is a measure of how responsive an application or subsystem is to a client request. |
Saturation |
Saturation refers to the point at which a resource has reached full utilization. |
Scalability |
Scalability refers to an
applicationŮs ability to handle additional workload, without adversely
affecting performance, by adding resources such as processor, memory,
and storage capacity. |
Scenarios |
In the context of performance testing, a scenario is a
sequence of steps in your application. A scenario can represent a use
case or a business function such as searching a product catalog, adding
an item to a shopping cart, or placing an order. |
Smoke test |
A smoke test is the initial run of a performance test to see if your application can perform its operations under a normal load. |
Spike test |
A spike test is a type of performance test focused on
determining or validating performance characteristics of the product
under test when subjected to workload models and load volumes that
repeatedly increase beyond anticipated production operations for short
periods of time. Spike testing is a subset of stress testing. |
Stability |
In the context of performance testing, stability refers to
the overall reliability, robustness, functional and data integrity,
availability, and/or consistency of responsiveness for your system
under a variety conditions. |
Stress test |
A stress test is a type of performance test designed to
evaluate an applicationŮs behavior when it is pushed beyond normal or
peak load conditions. The goal of stress testing is to reveal
application bugs that surface only under high load conditions. These
bugs can include such things as synchronization issues, race
conditions, and memory leaks. Stress testing enables you to identify
your applicationŮs weak points, and shows how the application behaves
under extreme load conditions. |
Throughput |
Throughput is the number of units of
work that can be handled per unit of time; for instance, requests per
second, calls per day, hits per second, reports per year, etc. |
Unit test |
In the context of performance testing, a unit test is any
test that targets a module of code where that module is any logical
subset of the entire existing code base of the application, with a
focus on performance characteristics. Commonly tested modules include
functions, procedures, routines, objects, methods, and classes.
Performance unit tests are frequently created and conducted by the
developer who wrote the module of code being tested. |
Utilization |
In the context of performance testing, utilization is the
percentage of time that a resource is busy servicing user requests. The
remaining percentage of time is considered idle time. |
Validation test |
A validation test compares the speed, scalability, and/or
stability characteristics of the product under test against the
expectations that have been set or presumed for that product. |
Workload |
Workload is the stimulus applied to a
system, application, or component to simulate a usage pattern, in
regard to concurrency and/or data inputs. The workload includes the
total number of users, concurrent active users, data volumes, and
transaction volumes, along with the transaction mix. For performance
modeling, you associate a workload with an individual scenario. |
Summary
Performance testing helps to identify bottlenecks in a system,
establish a baseline for future testing, support a performance tuning
effort, and determine compliance with performance goals and
requirements. Including performance testing very early in your
development life cycle tends to add significant value to the project.
For a performance-testing project to be successful, the testing
must be relevant to the context of the project, which helps you to
focus on the items that that are truly important.
If the performance characteristics are unacceptable, you will
typically want to shift the focus from performance testing to
performance tuning in order to make the application perform acceptably.
You will likely also focus on tuning if you want to reduce the amount
of resources being used and/or further improve system performance.
Performance, load, and stress tests are subcategories of performance testing, each intended for a different purpose.
Creating a baseline against which to evaluate the effectiveness of
subsequent performance-improving changes to the system or application
will generally increase project efficiency.