Print Page | Close Window

System Testing Cycles

Printed From: One Stop Testing
Category: Types Of Software Testing @ OneStopTesting
Forum Name: System Testing @ OneStopTesting
Forum Discription: Discuss All that is need to be known about System Software Testing and its Tools.
URL: http://forum.onestoptesting.com/forum_posts.asp?TID=3404
Printed Date: 24Dec2024 at 3:26pm


Topic: System Testing Cycles
Posted By: tanushree
Subject: System Testing Cycles
Date Posted: 29Oct2007 at 4:32am

System Testing Cycles:

The main thrust of the approach is to intensively test the front end in the first two releases, thus raising approximately 80% of errors in this period. With the majority of these errors fixed, standard and/or frequently used actions will be tested to prove individual elements and total system processing in Release v0.3. Regression testing of outstanding errors will be performed on an ongoing basis.

When all errors (which potentially impact overall processing) are fixed, an additional set of test cases are processed in Release v0.4 to ensure the system works in an integrated manner. It is intended that Release v0.4 be the final proving of the system as a single application. There should be no A or B class errors outstanding prior to the start of Release v0.4 testing.

Test Cases by Release version:

Testing by Phase  
  Acceptance 1
Release v0.1 Functional 1
  User Acceptance 
  Acceptance 2
Release v0.2 Functional 2
  Regression 1
  Acceptance 3
  Functional 3
Release v0.3 Performance 1
  Bash & Multi-User Testing
  Regression 1
  Regression 2
  Integration 1
  Technical 1
Release v0.4 Regression 1
  Regression 2
  Regression 3
  Installation Test
Contingency Per Bug Fix Test Only





Print Page | Close Window