Definition
Alpha testing is a very early version of a software product that may
not contain all of the features that are planned for the final version.
Typically, software goes through two stages of testing before it is
considered finished. The first stage, called alpha testing, is often
performed only by users within the organization developing the
software. The second stage, called beta testing , generally involves a
limited number of external users. In contrast to beta testing, alpha
software is usually assumed to have some significant bugs or
unimplemented portions.
Alpha Testing in Practice
How does Alpha testing work?
Alpha testing is the software prototype stage when the software is
first able to run. It will not have all the intended functionality, but
it will have core functions and will be able to accept inputs and
generate outputs. An alpha test usually takes place in the test lab
environment on a separate system.
Typcially, project manager utilizes this prototype to evaluate and
provide input to the developer as the design evolves. Although software
is usually not distributed to users prior to beta testing, selected
end-users may also be involved. Usually, the most complex or most used
parts of the code are developed more completely in the alpha, in order
to enable early resolution of design questions.
The project manager collaborates with the developer to determine
specific goals for alpha testing, and to integrate the results into
evolving project plans.
In-depth software reliability testing, installation testing, and
documentation testing are not done at alpha test time, as the software
is only a prototype.
Setting Expectations for External Customer If customers will receive alpha software, they must understand that
the product will be only minimally functional, and is likely to have
problems. Software QA team should check for the most serious
problems,like Data loss, System crash etc, but customers must still be
informed for unexpected or frustrating experiences.
A letter or e-mail accompanying alpha software is strongly recommended. This letter should make customers aware of:
● The software's limited functionality at this early stage
● The likelihood of experiencing problems
● Their mission: Find problems and provide feedback
● An example Alpha Transmittal Memo is available.
QA Team Involvement
It is understood that alpha software is not fully functional.
However, Software QA team should test all software that is to be sent
to users or run on customer equipment so that possible serious errors
can be removed. Examples of such errors are software behavior that
compromises a user's system, or cause data loss. This pre-testing of
alpha software that is sent to users will protect the reputation of
yorur company with customers.
If desired, the QA team should collect additional early usability
feedback on an alpha stage software code, such as feedback on the
proposed navigation scheme, and the look and feel of the soft
ware.
------------- MBA Examination papers
|
Replies:
Posted By: sairevathi
Date Posted: 29Sep2008 at 12:27am
After testing phase over.it is performed only by users with in the development company before releaseing project.so that we rectify the defects immediately.
|
|