Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumQuality Assurance @ OneStopTestingDefect Management@ OneStopTesting

Message Icon Topic: Testinfg FAQ

Post Reply Post New Topic
Author Message
appurva
Newbie
Newbie


Joined: 09Apr2007
Online Status: Offline
Posts: 1
Quote appurva Replybullet Topic: Testinfg FAQ
    Posted: 09Apr2007 at 9:28pm
What if the project isn't big enough to justify extensive testing?

Consider the impact of
project errors, not the size of the project. However, if extensive testing is
still not justified, risk analysis is again needed and the same considerations
as described previously in 'What if there isn't enough time
for thorough testing?' apply. The tester might then do ad hoc testing, or
write up a limited test plan based on the risk analysis

What if the software is so buggy it can't really be tested at all?

The best bet in this situation is for the testers to go through the process of reporting whatever bugs or blocking-type problems initially show up, with the focus being on critical bugs. Since this type of problem can severely affect schedules, and indicates deeper problems in the software development process (such as insufficient unit testing or insufficient integration testing, poor design, improper build or release procedures, etc.) managers should be notified, and provided with some documentation as evidence of the problem.
click here for more details:
http://www.onestopfaqs.com/faqs/1615/




Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
praveen.1781
Newbie
Newbie


Joined: 29Oct2007
Online Status: Offline
Posts: 1
Quote praveen.1781 Replybullet Posted: 31Oct2007 at 3:22am
What if the software is so buggy it can't really be tested at all?
 
In this situation the best bet is to have test engineers go through the process of reporting whatever bugs or problems initially show up, with the focus being on critical bugs. Since this type of problem can severely affect schedules and indicates deeper problems in the software development process, such as insufficient unit testing, insufficient integration testing, poor design, improper build or release procedures, managers should be notified and provided with some documentation as evidence of the problem.

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.609 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting