Quote Sucheta Replybullet Topic: When to stop testing ?
    Posted: 27Apr2007 at 11:35pm
I received Build 1 from Developer and re-tested all issues fixed in Build 1 I also logged issues against Build 1.

I informed the Developer I was ready for Build 2 because I had finished re-testing all of the issues fixed in Build 1.

However, I noticed some additional items with Build 1 and logged.

The challenging Developer stated "I thought you were finished with testing. I said no I told you I was finished re-testing the issues fixed in Build 1 and that I was ready for a new build with fixes for issues identified in Build 1."

My question is:
Should I have kept testing or just waited til I received another build? I just happened to notice more issues with the current BUILD 1 that I have installed and logged the issue. I don't see the problem since we are in the testing phase.



Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Piyali_2004
Newbie
Newbie
Avatar

Joined: 28Apr2007
Online Status: Offline
Posts: 1
Quote Piyali_2004 Replybullet Posted: 28Apr2007 at 4:53am
It's so hard to give a simple answer to this one. It depends so much on the product, the

build release frequency, the "alpha-ness" of the builds, etc. In our group, we EXPECT

people to keep testing a build until the next one shows up. But then again, for a product

that is batted back and forth like a ping-pong ball between one tester and one developer, I

agree that it can get a little irritating to the developer to be told about yet another bug

when he/she has just created a new build.

IP IP Logged
Zakir
Newbie
Newbie
Avatar

Joined: 27Jun2007
Location: United Kingdom
Online Status: Offline
Posts: 1
Quote Zakir Replybullet Posted: 29Jun2007 at 12:42am
The purpose of Softwre Testing is to ensure the functionality of the software is as per the FRS, so the simple way to deside when to stop the testing is, test case should have covered all the functionality of the application or the bug rate at certain level is very low.   
IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.219 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting