Active Topics Memberlist Calendar Search Help | |
Register Login |
One Stop Testing Forum : Types Of Software Testing @ OneStopTesting : System Testing @ OneStopTesting |
Topic: System Testing Cycles |
|
Author | Message | |||||||||||||||||||||||||||||||||||||||
tanushree
Senior Member Joined: 04Apr2007 Online Status: Offline Posts: 2160 |
Topic: System Testing Cycles Posted: 29Oct2007 at 4:32am |
|||||||||||||||||||||||||||||||||||||||
System Testing Cycles:
The main thrust of the approach is to
intensively test the front end in the first two releases, thus
raising approximately 80% of errors in this period. With the
majority of these errors fixed, standard and/or frequently used
actions will be tested to prove individual elements and total
system processing in Release v0.3. Regression testing of
outstanding errors will be performed on an ongoing basis. When all errors (which potentially impact overall processing) are fixed, an additional set of test cases are processed in Release v0.4 to ensure the system works in an integrated manner. It is intended that Release v0.4 be the final proving of the system as a single application. There should be no A or B class errors outstanding prior to the start of Release v0.4 testing. Test Cases by Release version:
Post Resume: Click here to Upload your Resume & Apply for Jobs |
||||||||||||||||||||||||||||||||||||||||
IP Logged | ||||||||||||||||||||||||||||||||||||||||
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.