Active Topics Memberlist Calendar Search Help | |
Register Login |
One Stop Testing Forum : Types Of Software Testing @ OneStopTesting : Manual Testing @ OneStopTesting |
Topic: SQA Processes. How to Test complete application? |
|
Author | Message |
Mithi25
Senior Member Joined: 23Jun2009 Online Status: Offline Posts: 288 |
Topic: SQA Processes. How to Test complete application? Posted: 15Oct2009 at 11:38pm |
Is there any standard procedure to test the application as a whole? Or How can I test complete application right from the requirement gathering? Here are the broad steps to test the application :These are the standard SQA peocesses to be followed in any application testing.
Review of the Objectives set for the Last Released Build
Target Date planned for the Releases and decision on the entire Project schedule that is required to achieve these target dates.
This includes the decision on Design Specifications (Productwise), review of the design specs and development schedule. This involves QA during the phase of review.
Test Plan : This is a top-level document that talks about how the product is going to be tested Feature Test Plan : This document talks about how the testing is going to be carried out for each type of testing.
This document includes technical details (Software requirements) required prior to the testing. It is important from the tester’s point of view to understand and plan the technical resources prior to the testing. Application Development : Considering the product features, tester has to make ready his/her own test suit.
- Smoke (BVT) test cases
- Installers are built around the individual product.
- A build includes Installers of the available products – multiple platforms.
- Smoke Test (BVT) to check basic features of the product.
- Testing of new features
- Use of Trackweb’s “Soffront” as the Bug Tracking tool.
No more new features are added at this point.
Candidate Builds and regression testing.
CDs are cut for the released products and the product is installed using those CDs and it takes place in San Jose.
A review meeting to analyze the performance of the product, which is set, and the same is compared with the objectives set.
One branch is kept for the post release modification and hence the product testing. |
|
Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
IP Logged | |
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.