Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumQuality Assurance @ OneStopTestingQuality Methodologies / Streams @ OneStopTesting

Message Icon Topic: CAPABILITY MATURITY MODEL (CMM)

Post Reply Post New Topic
Author Message
tanushree
Senior Member
Senior Member
Avatar

Joined: 04Apr2007
Online Status: Offline
Posts: 2160
Quote tanushree Replybullet Topic: CAPABILITY MATURITY MODEL (CMM)
    Posted: 17Oct2007 at 12:54am
CMM describes software process management maturity relative to five levels

ie., Initial, Repeatable, Defined, Managed, Optimizing

In the Initial level there is a lack of planning and the development of a clear-cut guide that software development teams can follow. Few details of a software process have been defined at this level. Good results are considered miraculous.

KPA ---- Key Process Areas

In the Second level ie., the CMM Repeatable Process is characterized by a commitment to discipline in carrying out a software development project. And is achieved by : Requirements management, software project planning, software project tracking and oversight, software subcontract management, software quality assurance, software configuration management.

In the Third level ie., the CMM Defined Process is to guide the structuring and evaluation of a software project. And is achieved by : Organisational process focus and definition, training program, software product engineering, intergroup coordination, peer reviews.

In the Fourth level ie., the CMM Managed Process is for data gathering and analysis and managing software quality. And is achieved by : Quantitative process management, Software quality management.

In the Fifth level ie., the CMM Optimizing Process is associated with defect prevention, automation of the software process wherever possible, and methods for improving software quality and team productivity and shortening development time.



Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
santoshsapkal
Newbie
Newbie


Joined: 17Apr2008
Location: India
Online Status: Offline
Posts: 1
Quote santoshsapkal Replybullet Posted: 23May2008 at 3:49am
This might be easy to understand.....

Level 1 – Initial: Processes are usually not documented and change based on the user or event. The organization does not have a stable environment

Level 2 – Repeatable: Some software development processes are repeatable, possibly with consistent results. The processes may not repeat for all the projects in the organization. The organization may use some basic project management to track cost and schedule.

Level 3 – Defined: The organization’s set of standard processes, which are the basis for level 3, are established and subject to some degree of improvement over time.

Level 4 – Managed: Management can effectively control the process (e.g., for software development). In particular, management can identify ways to adjust and adapt the process to particular projects without measurable losses of quality or deviations from specifications.

Level 5 – Optimizing: Focuses on continually improving process performance through both incremental and innovative technological improvements.
IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.387 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting