Active Topics Memberlist Calendar Search Help | |
Register Login |
One Stop Testing Forum : Types Of Software Testing @ OneStopTesting : Manual Testing @ OneStopTesting |
Topic: Bug life cycle |
|
Author | Message |
Mithi25
Senior Member Joined: 23Jun2009 Online Status: Offline Posts: 288 |
Topic: Bug life cycle Posted: 14Oct2009 at 11:24pm |
What is Bug/Defect? Simple Wikipedia definition of Bug is: “A computer bug is an error, flaw, mistake, failure, or fault in a computer program that prevents it from working correctly or produces an incorrect result. Bugs arise from mistakes and errors, made by people, in either a program’s source code or its design.” Other definitions can be:
or Lastly the general definition of bug is: “failure to conform to specifications”. If you want to detect and resolve the defect in early development stage, defect tracking and software development phases should start simultaneously. We will discuss more on Writing effective bug report in another article. Let’s concentrate here on bug/defect life cycle. Life cycle of Bug: 1) Log new defect In above list you can add some optional fields if you are using manual Bug submission template: The following fields remain either specified or blank: Look at the following Bug life cycle: [Click on the image to view full size] Ref: Bugzilla bug life cycle The figure is quite complicated but when you consider the significant steps in bug life cycle you will get quick idea of bug life. On successful logging the bug is reviewed by Development or Test manager. Test manager can set the bug status as Open, can Assign the bug to developer or bug may be deferred until next release. When bug gets assigned to developer and can start working on it. Developer can set bug status as won’t fix, Couldn’t reproduce, Need more information or ‘Fixed’. If the bug status set by developer is either ‘Need more info’ or Fixed then QA responds with specific action. If bug is fixed then QA verifies the bug and can set the bug status as verified closed or Reopen. Bug status description: 1) New: When QA files new bug. 2) Deferred: If the bug is not related to current build or can not be fixed in this release or bug is not important to fix immediately then the project manager can set the bug status as deferred. 3) Assigned: ‘Assigned to’ field is set by project lead or manager and assigns bug to developer. 4) Resolved/Fixed: When developer makes necessary code changes and verifies the changes then he/she can make bug status as ‘Fixed’ and the bug is passed to testing team. 5) Could not reproduce: If developer is not able to reproduce the bug by the steps given in bug report by QA then developer can mark the bug as ‘CNR’. QA needs action to check if bug is reproduced and can assign to developer with detailed reproducing steps. 6) Need more information: If developer is not clear about the bug reproduce steps provided by QA to reproduce the bug, then he/she can mark it as “Need more information’. In this case QA needs to add detailed reproducing steps and assign bug back to dev for fix. 7) Reopen: If QA is not satisfy with the fix and if bug is still reproducible even after fix then QA can mark it as ‘Reopen’ so that developer can take appropriate action. 8 ) Closed: If bug is verified by the QA team and if the fix is ok and problem is solved then QA can mark bug as ‘Closed’. 9) Rejected/Invalid: Some times developer or team lead can mark the bug as Rejected or invalid if the system is working according to specifications and bug is just due to some misinterpretation. |
|
Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
IP Logged | |
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.