Message Icon Topic: Steps needed to develop and run software tests

Post Reply Post New Topic
Author Message
appurva
Newbie
Newbie


Joined: 09Apr2007
Online Status: Offline
Posts: 1
Quote appurva Replybullet Topic: Steps needed to develop and run software tests
    Posted: 09Apr2007 at 10:07pm
What steps are needed to develop and run software tests?

The following are some of the steps to consider:

* Obtain requirements, functional design, and internal design specifications and other necessary documents
* Obtain budget and schedule requirements
* Determine project-related personnel and their responsibilities, reporting requirements, required standards and processes (such as release processes, change processes, etc.)
* Determine project context, relative to the existing quality culture of the organization and business, and how it might impact testing scope, aproaches, and methods.
* Identify application's higher-risk aspects, set priorities, and determine scope and limitations of tests
* Determine test approaches and methods - unit, integration, functional, system, load, usability tests, etc.
* Determine test environment requirements (hardware, software, communications, etc.)
* Determine testware requirements (record/playback tools, coverage analyzers, test tracking, problem/bug tracking, etc.)
* Determine test input data requirements
* Identify tasks, those responsible for tasks, and labor requirements
* Set schedule estimates, timelines, milestones
* Determine input equivalence classes, boundary value analyses, error classes
* Prepare test plan document and have needed reviews/approvals
* Write test cases
* Have needed reviews/inspections/approvals of test cases
* Prepare test environment and testware, obtain needed user manuals/reference documents/configuration guides/installation guides, set up test tracking processes, set up logging and archiving processes, set up or obtain test input data
* Obtain and install software releases
* Perform tests
* Evaluate and report results
* Track problems/bugs and fixes
* Retest as needed
* Maintain and update test plans, test cases, test environment, and testware through life cycle
clik here for more details:
http://www.onestopfaqs.com/faqs/1625/





Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 6.703 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting