Waterfall ModelWaterfall approach
was first Process Model to be introduced and followed widely in Software
Engineering to ensure success of the project. In "The Waterfall" approach, the
whole process of software development is divided into separate process phases.
Requirement Analysis & Definition: All possible requirements of the system to be developed are captured in this phase. Requirements are set of functionalities and constraints that the end-user (who will be using the system) expects from the system. The requirements are gathered from the end-user by consultation, these requirements are analyzed for their validity and the possibility of incorporating the requirements in the system to be development is also studied. Finally, a Requirement Specification document is created which serves the purpose of guideline for the next phase of the model. System &
Software Design: Before a starting for actual coding, it is highly important
to understand what we are going to create and what it should look like? The
requirement specifications from first phase are studied in this phase and system
design is prepared. System Design helps in specifying
hardware
and system requirements and also helps in defining overall system architecture.
The system design specifications serve as input for the next phase of the model. Implementation
& Unit Testing: On receiving system design documents, the work is divided in
modules/units and actual coding is started. The system is first developed in
small programs called units, which are integrated in the next phase. Each unit
is developed and tested for its functionality; this is referred to as Unit
Testing. Unit testing mainly verifies if the modules/units meet their
specifications. Integration &
System Testing: As specified above, the system is first divided in units
which are developed and tested for their functionalities. These units are
integrated into a complete system during Integration phase and tested to check
if all modules/units coordinate between each other and the system as a whole
behaves as per the specifications. After successfully testing the software, it
is delivered to the customer. Operations & Maintenance: This phase of "The Waterfall Model" is virtually never ending phase (Very long). Generally, problems with the system developed (which are not found during the development life cycle) come up after its practical use starts, so the issues related to the system are solved after deployment of the system. Not all the problems come in picture directly but they arise time to time and needs to be solved; hence this process is referred as Maintenance.
Edited by raghugn - 02Jul2009 at 12:09am Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
IP Logged | |
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.