![]() |
![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() |
|
![]() ![]() |
Author | Message |
tanushree
Senior Member ![]() Joined: 04Apr2007 Online Status: Offline Posts: 2160 |
![]() ![]() ![]() Posted: 11Oct2007 at 12:14am |
History of the Waterfall Model
In 1970 Royce proposed what is now popularly referred to as the waterfall model as an initial concept, a model which he argued was flawed (Royce 1970). His paper then explored how the initial model could be developed into an iterative model, with feedback from each phase influencing previous phases, similar to many methods used widely and highly regarded by many today. Despite Royce's intentions for the waterfall model to be modified into an iterative model, use of the "waterfall model" as a purely sequential process is still popular, and, for some, the phrase "waterfall model" has since come to refer to any approach to software creation which is seen as inflexible and non-iterative. Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
![]() |
|
![]() ![]() |
||
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.