Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumSoftware Testing @ OneStopTestingVersioning & Configuration Management @ OneStopTesting

Message Icon Topic: Software release life cycle

Post Reply Post New Topic
Author Message
rose
Moderator Group
Moderator Group
Avatar

Joined: 31Jan2007
Online Status: Offline
Posts: 21
Quote rose Replybullet Topic: Software release life cycle
    Posted: 08Feb2007 at 12:28pm
Software release life cycle:

A software release refers to the distribution, whether public or private, of an initial or new and upgraded version of a computer software product. Each time a software program or system is changed, the programmers and company doing the work decide on how to distribute the program or system, or changes to that program or system. Software patches are one method of distributing the changes, as are downloads and compact discs.

The software release life cycle is composed of different stages that describe the stability of a piece of software and the amount of development it requires before final release. Each major version of a product usually goes through a stage when new features are added, or the alpha stage; a stage when it is being actively debugged, or the beta stage; and finally a stage when all important bugs have been removed, or the stable stage. Intermediate stages may also be recognized. The stages may be formally announced and regulated by the project's developers, but sometimes the terms are used informally to describe the state of a product. Conventionally, code names are often used by many companies for versions prior to the release of the product, though the actual product and features are rarely secret.

Software release stages:
 
    Pre-alpha:
Sometimes a build known as pre-alpha is issued, before the release of an alpha or beta. In contrast to alpha and beta versions, the pre-alpha is usually not "feature complete". At this stage designers are still determining exactly what functionalities the product should and should not have.
        Alpha:

The alpha version of a product still awaits full debugging or full implementation of all its functionality but satisfies a majority of the software requirements. It often lacks features promised in the final release but demonstrates the feasibility and basic structure of the software. As the first major stage in the release lifecycle, it is named after the Greek letter alpha, the first letter in the Greek alphabet.

The alpha build of the software is usually the first build delivered to the software testers.

In the first phase of alpha testing, developers test the software using white box techniques. Additional inspection is then performed using black box or grey box techniques. This is usually done by another dedicated testing team sometimes concurrently. Moving to black box testing is often known as the second stage of alpha testing.

      Beta:

A beta version or beta release usually represents the first version of a computer program that implements all features in the initial requirements analysis. It is likely to be useful for internal demonstrations and previews to select customers, but unstable and not yet ready for release. Some developers refer to this stage as a preview, as a technical preview (TP) or as an early access. As the second major stage in the release lifecycle, following the alpha stage, it is named after the Greek letter beta, the second letter in the Greek alphabet.

Often this stage begins when the developers announce a feature freeze on the product, indicating that no more feature requirements will be accepted for this version of the product. Only software issues, or bugs and unimplemented features will be addressed.

Beta versions stand at an intermediate step in the full development cycle. Developers release either a closed beta or an open beta; closed beta versions are released to a select group of individuals for a user test, while open betas are to a larger community group, usually the general public. The testers report any bugs that they found and sometimes minor features they would like to see in the final version.

 Release candidate: 

The term release candidate refers to a final product, ready to release unless fatal bugs emerge. In this stage, the product features all designed functionalities and no known showstopper class bugs. At this phase the product is usually code complete.

Gold/general availability release: 

The gold or general availability release version is the final version of a particular product. It is typically almost identical to the final release candidate, with only last-minute bugs fixed. A gold release is considered to be very stable and relatively bug-free with a quality suitable for wide distribution and use by end users. In commercial software releases, this version may also be signed (used to allow end-users to verify that code has not been modified since the release). The expression that a software product "has gone gold" means that the code has been completed and "is being mass-produced and will be for sale soon." Other terms for the version include gold master, gold release, or gold build.

The term gold anecdotally refers to the use of "gold master disc" which was commonly used to send the final version to manufacturers who use it to create the mass-produced retail copies. It may in this context be a hold-over from music production. In some cases, however, the master disc is still actually made of gold, for both aesthetic appeal and resistance to corrosion.

    Box Copy:

A box copy is the final product, printed on a disc that is included in the actual release, complete with disc graphic art. This term is used mostly by reviewers to differentiate from gold master discs. A box copy does not necessarily come enclosed in the actual boxed product - it refers to the disc itself.

rgds
rose


Edited by moderator - 05May2007 at 2:21am



Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 1.766 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting