Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumSoftware Testing @ OneStopTestingBeginners @ OneStopTesting

Message Icon Topic: Criticism of the waterfall model !!!!

Post Reply Post New Topic
Author Message
tanushree
Senior Member
Senior Member
Avatar

Joined: 04Apr2007
Online Status: Offline
Posts: 2160
Quote tanushree Replybullet Topic: Criticism of the waterfall model !!!!
    Posted: 11Oct2007 at 12:12am
Criticism of the waterfall model

The waterfall model however is argued by many to be a bad idea in practice, mainly because of their belief that it is impossible to get one phase of a software product's lifecycle "perfected" before moving on to the next phases and learning from them. A typical problem is when requirements change midway through, resulting in a lot of time and effort being invalidated due to the "Big Design Up Front".

In summary, the criticisms of a non-iterative development approach (such as the waterfall model) are as follows:
        
Poor flexibility; the majority of software is written as part of a contract with a client, and clients are notorious for changing their stated requirements. Thus the software project must be adaptable, and spending considerable effort in design and implementation based on the idea that requirements will never change is neither adaptable nor realistic in these cases.
  
Unless those who specify requirements and those who design the software system in question are highly competent, it is difficult to know exactly what is needed in each phase of the software process before some time is spent in the phase "following" it.
  
Constant testing from the design, implementation and verification phases is required to validate the phases preceding them. Users of the waterfall model may argue that if designers follow a disciplined process and do not make mistakes that there is no need to constantly validate the preceding phases.
  
Frequent incremental builds (following the "release early, release often" philosophy) are often needed to build confidence for a software production team and their client.
  
It is difficult to estimate time and cost for each phase of the development process.
  
The waterfall model brings no formal means of exercising management control over a project and planning control and risk management are not covered within the model itself.
  
Only a certain number of team members will be qualified for each phase, which can lead to some team members twiddling their thumbs.



Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.329 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting