Quote Anuja Replybullet Topic: test effort Estimations industry standards
    Posted: 27Apr2007 at 1:52am
Going through the forums i understand a bit of estimations now ,but still i do have some queries
1.When people say for full SDLC project the testing effort is about 30-35% percent of development effort .So in that 30 %of time is all testing included i.e Unit ,intergration ,system,performance and acceptance )
2.How to estimate time for Knowledge transfer/transition or requirement familiarization .(Is this time is included in 30%)
3.Lastly i want to know the industry standards for the %time required for unit testing ,integration testing ,functional testing ,performance testing within that 30% time
4. Also the % time required for the activites like test case writing,execution,rework and review



Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Megha
Newbie
Newbie
Avatar

Joined: 27Apr2007
Online Status: Offline
Posts: 1
Quote Megha Replybullet Posted: 27Apr2007 at 5:32am
Going through the forums i understand a bit of estimations now ,but still i do have some

queries

    Quote:
    1.When people say for full SDLC project the testing effort is about 30-35% percent of

development effort .So in that 30 %of time is all testing included i.e Unit ,intergration

,system,performance and acceptance )



When I provide estimates for testing it is usually QA and UAT, and these are provided

separately. I do not use the 30% but if I did it would be for those 2 items. Unit and

integration testing, IMO, are part of the developer estimates.

    Quote:

    2.How to estimate time for Knowledge transfer/transition or requirement familiarization

.(Is this time is included in 30%)



My estimates allow time for familiarization with the requirements.

[quote[
3.Lastly i want to know the industry standards for the %time required for unit testing

,integration testing ,functional testing ,performance testing within that 30% time
4. Also the % time required for the activites like test case writing,execution,rework and

review

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.813 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting