Active Topics Memberlist Calendar Search Help | |
Register Login |
One Stop Testing Forum : Software Testing @ OneStopTesting : Beginners @ OneStopTesting |
Topic: Software Life Cycle |
|
Author | Message |
tanushree
Senior Member Joined: 04Apr2007 Online Status: Offline Posts: 2160 |
Topic: Software Life Cycle Posted: 26Oct2007 at 3:51am |
Software Life Cycle
The software life cycle typically includes the following: requirements analysis, design, coding, testing, installation and maintenance. In between, there can be a requirement to provide Operations and support activities for the product. Requirements Analysis. Software organizations provide solutions to customer requirements by developing appropriate software that best suits their specifications. Thus, the life of software starts with origin of requirements. Very often, these requirements are vague, emergent and always subject to change.Analysis is performed to - To conduct in depth analysis of the proposed project, To evaluate for technical feasibility, To discover how to partition the system, To identify which areas of the requirements need to be elaborated from the customer, To identify the impact of changes to the requirements, To identify which requirements should be allocated to which components. Design and Specifications. The outcome of requirements analysis is the requirements specification. Using this, the overall design for the intended software is developed. Activities in this phase - Perform Architectural Design for the software, Design Database (If applicable), Design User Interfaces, Select or Develop Algorithms (If Applicable), Perform Detailed Design.Coding. The development process tends to run iteratively through these phases rather than linearly; several models (spiral, waterfall etc.) have been proposed to describe this process. Activities in this phase - Create Test Data, Create Source, Generate Object Code, Create Operating Documentation, Plan Integration, Perform Integration. Testing. The process of using the developed system with the intent to find errors. Defects/flaws/bugs found at this stage will be sent back to the developer for a fix and have to be re-tested. This phase is iterative as long as the bugs are fixed to meet the requirements. Activities in this phase - Plan Verification and Validation, Execute Verification and validation Tasks, Collect and Analyze Metric Data, Plan Testing, Develop Test Requirements, Execute Tests. Installation. The so developed and tested software will finally need to be installed at the client place. Careful planning has to be done to avoid problems to the user after installation is done. Activities in this phase - Plan Installation, Distribution of Software, Installation of Software, Accept Software in Operational Environment. Operation and Support. Support activities are usually performed by the organization that developed the software. Both the parties usually decide on these activities before the system is developed. Activities in this phase - Operate the System, Provide Technical Assistance and Consulting, Maintain Support Request Log. Maintenance. The process does not stop once it is completely implemented and installed at user place; this phase undertakes development of new features, enhancements etc. Activities in this phase - Reapplying Software Life Cycle. Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
IP Logged | |
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.