Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumTypes Of Software Testing @ OneStopTestingIntegration Testing @ OneStopTesting

Message Icon Topic: Combining module testing and integration testing

Post Reply Post New Topic
Author Message
Sandeep
Newbie
Newbie


Joined: 23Feb2007
Online Status: Offline
Posts: 1
Quote Sandeep Replybullet Topic: Combining module testing and integration testing
    Posted: 23Feb2007 at 5:23pm
The simplest application of structured testing to integration is to combine module testing with integration testing so that a basis set of paths through each module is executed in an integration context. This means that the techniques of section 5 can be used without modification to measure the level of testing. However, this method is only suitable for a subset of integration strategies.

The most obvious combined strategy is pure "big bang" integration, in which the entire system is assembled and tested in one step without even prior module testing. As discussed earlier, this strategy is not practical for most real systems. However, at least in theory, it makes efficient use of testing resources. First, there is no overhead associated with constructing stubs and drivers to perform module testing or partial integration. Second, no additional integration-specific tests are required beyond the module tests as determined by structured testing. Thus, despite its impracticality, this strategy clarifies the benefits of combining module testing with integration testing to the greatest feasible extent.

It is also possible to combine module and integration testing with the bottom-up integration strategy. In this strategy, using test drivers but not stubs, begin by performing module-level structured testing on the lowest-level modules using test drivers. Then, perform module-level structured testing in a similar fashion at each successive level of the design hierarchy, using test drivers for each new module being tested in integration with all lower-level modules. Figure 7-1 illustrates the technique. First, the lowest-level modules "B" and "C" are tested with drivers. Next, the higher-level module "A" is tested with a driver in integration with modules "B" and "C." Finally, integration could continue until the top-level module of the program is tested (with real input data) in integration with the entire program. As shown in Figure 7-1, the total number of tests required by this technique is the sum of the cyclomatic complexities of all modules being integrated. As expected, this is the same number of tests that would be required to perform structured testing on each module in isolation using stubs and drivers.




Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 1.938 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting