Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumTesting Tools @ OneStopTestingTestDirector @ OneStopTesting

Message Icon Topic: Test Planning

Post Reply Post New Topic
Author Message
tanushree
Senior Member
Senior Member
Avatar

Joined: 04Apr2007
Online Status: Offline
Posts: 2160
Quote tanushree Replybullet Topic: Test Planning
    Posted: 17Oct2007 at 4:07am
Test Planning
TestDirector provides a configurable facility to organise and manage a test programme of any size, including control of testing scope, content, resources and workflows. A simple version control feature has been created to allow development of test cases through creation, review and approval cycles incorporating application of electronic or digital signatures to the master documents at the approval stage as required. Once a single signature is applied to a test case the test case is locked from any further changes and the integrity of the signed test case is maintained throughout its lifecycle. It is not possible to delete a test case once a single electronic or digital signature has been applied to it



Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.171 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting