Active Topics Memberlist Calendar Search Help | |
Register Login |
One Stop Testing Forum : Types Of Software Testing @ OneStopTesting : Usability & Accessibility Testing @ OneStopTesting |
Topic: user interface testing in CMM 5 |
|
Author | Message |
Suparna
Groupie Joined: 28Apr2007 Online Status: Offline Posts: 72 |
Topic: user interface testing in CMM 5 Posted: 14May2007 at 5:48am |
1 Service Description: Process to validate the User Interaction with the Application/Product. A user interface is an interface that enables information to be passed between a human user and hardware or software components of a computer system. [IEEE, Std 610.12-1990] 1. Process Flow: GUI standards/satyam standards, people addressing, multilingual,, user manuals, flow chart-testplans, testcases, bug reporting, test evaluation, user friendly error massages etc. 2. Sub Process Flow: screen resolutions, compatibility testing, software, hardware settings. 3. Templates, Documents, Tools: checklist, automated tools like winrunner, silk, rational robot, QARUN etc.; 4. Measures: 25 controls/hr, schedules, number of defects tracked, for every one master 3 child records, no. of screens, how fast the system 5. Targets: 25% over the measure i.e. 40 controls/hr 6. Improvement Plan: Training, knowledge sharing, usage of tools 7. Support Requirements: Hardware, software, networks, databases,
browser’s, drivers viz. odbc, jdbc, Secure socket layers, tools
licenses, Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
IP Logged | |
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.