Active Topics Memberlist Calendar Search Help | |
Register Login |
One Stop Testing Forum : Software Testing @ OneStopTesting : Beginners @ OneStopTesting |
Topic: Cost of fixing bugs |
|
Author | Message |
tanushree
Senior Member Joined: 04Apr2007 Online Status: Offline Posts: 2160 |
Topic: Cost of fixing bugs Posted: 26Oct2007 at 4:02am |
Cost of fixing bugs Costs are logarithmic; they increase in size tenfold as the time increases. A bug found and fixed during the early stages – requirements or product spec stage can be fixed by a brief interaction with the concerned and might cost next to nothing. During coding, a swiftly spotted mistake may take only very less effort to fix. During integration testing, it costs the paperwork of a bug report and a formally documented fix, as well as the delay and expense of a re-test. During system testing it costs even more time and may delay delivery. Finally, during operations it may cause anything from a nuisance to a system failure, possibly with catastrophic as an aircraft or an emergency service. Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
IP Logged | |
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.