Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumTypes Of Software Testing @ OneStopTestingIntegration Testing @ OneStopTesting

Message Icon Topic: Effective Integration Testing

Post Reply Post New Topic
Author Message
soumali
Newbie
Newbie
Avatar

Joined: 02Apr2007
Online Status: Offline
Posts: 34
Quote soumali Replybullet Topic: Effective Integration Testing
    Posted: 13Jun2007 at 1:00am
There are various factors that affect Software Integration and hence Integration Testing:

1) Software Configuration Management: Since Integration Testing focuses on Integration of components and components can be built by different developers and even different development teams, it is important the right version of components are tested. This may sound very basic, but the biggest problem faced in n-tier development is integrating the right version of components. Integration testing may run through several iterations and to fix bugs components may undergo changes. Hence it is important that a good Software Configuration Management (SCM) policy is in place. We should be able to track the components and their versions. So each time we integrate the application components we know exactly what versions go into the build process.

2) Automate Build Process where Necessary:
A Lot of errors occur because the wrong version of components were sent for the build or there are missing components. If possible write a script to integrate and deploy the components this helps reduce manual errors.

3) Document: Document the Integration process/build process to help eliminate the errors of omission or oversight. It is possible that the person responsible for integrating the components forgets to run a required script and the Integration Testing will not yield correct results.

4) Defect Tracking:
Integration Testing will lose its edge if the defects are not tracked correctly. Each defect should be documented and tracked. Information should be captured as to how the defect was fixed. This is valuable information. It can help in future integration and deployment processes.




Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
JustinH
Newbie
Newbie
Avatar

Joined: 28Jul2009
Location: United States
Online Status: Offline
Posts: 13
Quote JustinH Replybullet Posted: 22Sep2009 at 2:04am
See also "Efficient and Effective Test Case Design" ... http://hexawise.wordpress.com/2009/09/18/efficient-and-effective-test-design/

- Justin

- Justin
___________________________
Founder and CEO of Hexawise
www.hexawise.com
"More coverage. Fewer tests."
IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 2.078 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting