Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumSoftware Testing @ OneStopTestingBeginners @ OneStopTesting

Message Icon Topic: Software Testing Life Cycle

Post Reply Post New Topic
Author Message
tanushree
Senior Member
Senior Member
Avatar

Joined: 04Apr2007
Online Status: Offline
Posts: 2160
Quote tanushree Replybullet Topic: Software Testing Life Cycle
    Posted: 26Oct2007 at 3:59am

Software Testing Life Cycle

Software Testing Life Cycle consist of six (generic) phases: 1) Planning, 2) Analysis, 3) Design, 4) Construction, 5) Testing Cycles, 6) Final Testing and Implementation and 7) Post Implementation. Each phase in the life cycle is described with the respective activities.

Planning. Planning High Level Test plan, QA plan (quality goals), identify – reporting procedures, problem classification, acceptance criteria, databases for testing, measurement criteria (defect quantities/severity level and defect origin), project metrics and finally begin the schedule for project testing. Also, plan to maintain all test cases (manual or automated) in a database.

Analysis. Involves activities that - develop functional validation based on Business Requirements (writing test cases basing on these details), develop test case format (time estimates and priority assignments), develop test cycles (matrices and timelines), identify test cases to be automated (if applicable), define area of stress and performance testing, plan the test cycles required for the project and regression testing, define procedures for data maintenance (backup, restore, validation), review documentation.

Design. Activities in the design phase - Revise test plan based on changes, revise test cycle matrices and timelines, verify that test plan and cases are in a database or requisite, continue to write test cases and add new ones based on changes, develop Risk Assessment Criteria, formalize details for Stress and Performance testing, finalize test cycles (number of test case per cycle based on time estimates per test case and priority), finalize the Test Plan, (estimate resources to support development in unit testing).

Construction (Unit Testing Phase). Complete all plans, complete Test Cycle matrices and timelines, complete all test cases (manual), begin Stress and Performance testing, test the automated testing system and fix bugs, (support development in unit testing), run QA acceptance test suite to certify software is ready to turn over to QA.

Test Cycle(s) / Bug Fixes (Re-Testing/System Testing Phase). Run the test cases (front and back end), bug reporting, verification, revise/add test cases as required.

Final Testing and Implementation (Code Freeze Phase). Execution of all front end test cases - manual and automated, execution of all back end test cases - manual and automated, execute all Stress and Performance tests, provide on-going defect tracking metrics, provide on-going complexity and design metrics, update estimates for test cases and test plans, document test cycles, regression testing, and update accordingly.

Post Implementation. Post implementation evaluation meeting can be conducted to review entire project. Activities in this phase - Prepare final Defect Report and associated metrics, identify strategies to prevent similar problems in future project, automation team - 1) Review test cases to evaluate other cases to be automated for regression testing, 2) Clean up automated test cases and variables, and 3) Review process of integrating results from automated testing in with results from manual testing.




Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.266 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting