A sample testing cycleAlthough testing varies between organizations, there is a cycle to testing:
Not all errors or defects reported must be fixed by a software development team. Some may be caused by errors in configuring the test software to match the development or production environment. Some defects can be handled by a workaround in the production environment. Others might be deferred to future releases of the software, or the deficiency might be accepted by the business user. There are yet other defects that may be rejected by the development team (of course, with due reason) if they deem it inappropriate to be called a defect. |
|
MBA Examination papers
![]() Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
![]() |
|
sairevathi
Newbie ![]() Joined: 25Sep2008 Location: India Online Status: Offline Posts: 34 |
![]() ![]() ![]() |
Tesing life cycle means STLC (s/w testing life cycle)
1)test planing 2)test design 3)test execution 4)Result anlysis 5)bug reporting&result anlaysis test planing: it is straegic document.it is prepared by the lead.the mail is to get effetive & efficient at the end of testing without planning we cannot get qualitative output Test desiging:Here we write test case document 1)the majorrole has taken by test engineer the colums of the test cse document is 1)test case id :it is identification no 2)test description:Here we understand the functionality of the application 3)test scenario:In which situvation we have test the application 4test condition: GuITesting:Here we check the consistency,allignment&spelling mistakes Functionality Testing:Here We check the Functional Behavioural of the application 4)test data:Through the tables we acess the data in the form of links 5)Result:Here check the expected result is equal to the actual result or not If equal test pass If not equal test fail Bug tracking:if test is fail then send defect to devlopment team upto rectification After rectification release the project to client Edited by sairevathi - 28Sep2008 at 11:11pm |
|
![]() |
|
![]() ![]() |
||