Active Topics Memberlist Calendar Search Help | |
Register Login |
One Stop Testing Forum : Types Of Software Testing @ OneStopTesting : Automated Testing @ OneStopTesting |
Topic: Case Study: Costly Automation Failures |
|
Author | Message |
sindhu
Newbie Joined: 11Apr2007 Online Status: Offline Posts: 1 |
Topic: Case Study: Costly Automation Failures Posted: 11Apr2007 at 9:54pm |
Case Study: Costly Automation Failures In 1996, one large corporation set out evaluating the various commercial automation tools that were available at that time. They brought in eager technical sales staff from the various vendors, watched demonstrations, and performed some fairly thorough internal evaluations of each tool. By 1998, they had chosen one particular vendor and placed an initial order for over $250,000 worth of product licensing, maintenance contracts, and onsite training. The tools and training were distributed throughout the company into various test departments--each working on their own projects. None of these test projects had anything in common. The applications were vastly different. The projects each had individual schedules and deadlines to meet. Yet, every one of these departments began separately coding functionally identical common libraries. They made routines for setting up the Windows test environment. They each made routines for accessing the Windows programming interface. They made file-handling routines, string utilities, database access routines--the list of code duplication was disheartening! For their test designs, they each captured application specific interactive tests using the capture\replay tools. Some groups went the next step and modularized key reusable sections, creating reusable libraries of application-specific test functions or scenarios. This was to reduce the amount of code duplication and maintenance that so profusely occurs in pure captured test scripts. For some of the projects, this might have been appropriate if done with sufficient planning and an appropriate automation framework. But this was seldom the case. With all these modularized libraries testers could create functional automated tests in the automation tool’s proprietary scripting language via a combination of interactive test capture, manual editing, and manual scripting. One problem was, as separate test teams they did not think past their own individual projects. And although they were each setting up something of a reusable framework, each was completely unique--even where the common library functions were the same! This meant duplicate development, duplicate debugging, and duplicate maintenance. Understandably, each separate project still had looming deadlines, and each was forced to limit their automation efforts in order to get real testing done. As changes to the various applications began breaking automated tests, script maintenance and debugging became a significant challenge. Additionally, upgrades in the automation tools themselves caused significant and unexpected script failures. In some cases, the necessity to revert back (downgrade) to older versions of the automation tools was indicated. Resource allocation for continued test development and test code maintenance became a difficult issue. Eventually, most of these automation projects were
put on hold. By the end of 1999--less than two years from the inception
of this large-scale automation effort--over 75% of the test automation
tools were back on the shelves waiting for a new chance to try again at
some later date. Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
IP Logged | |
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.