Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumTypes Of Software Testing @ OneStopTestingManual Testing @ OneStopTesting

Message Icon Topic: traceability matrix

Post Reply Post New Topic
Author Message
hemajose
Newbie
Newbie


Joined: 29Oct2007
Online Status: Offline
Posts: 1
Quote hemajose Replybullet Topic: traceability matrix
    Posted: 10Jan2008 at 4:00am
 How will you prepare traceability matrix if there is no Business Doc and Functional Doc?



Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
kiranpaul20
Newbie
Newbie
Avatar

Joined: 17Mar2008
Online Status: Offline
Posts: 1
Quote kiranpaul20 Replybullet Posted: 25Mar2008 at 11:25pm
Get Briefings from the BA's Developers , PM/PL understand the domain of the application, try to understand the application by going through the prototype, Understand the modules and their functionalities. list out different sceanroius, document them in the traceability matrices 
IP IP Logged
v_selvam
Newbie
Newbie
Avatar

Joined: 17Mar2008
Location: India
Online Status: Offline
Posts: 1
Quote v_selvam Replybullet Posted: 26Mar2008 at 1:34am
Yeah..I accept kiranpaul20.
IP IP Logged
Fredri
Newbie
Newbie
Avatar

Joined: 06Aug2008
Location: India
Online Status: Offline
Posts: 1
Quote Fredri Replybullet Posted: 11Aug2008 at 5:45am
Hi
  Tracablilty Matrix Prepare
 
1. User Requirement Doc's
2. Screen Design Document
 
Read Thorughly and take the differences with each Document, Its Called 'Tracablity Matrix'
IP IP Logged
chaitanyak6
Newbie
Newbie


Joined: 11Dec2008
Location: India
Online Status: Offline
Posts: 1
Quote chaitanyak6 Replybullet Posted: 12Dec2008 at 12:17am
Traceability Matrix lists all the functionality or features and the test cases for each feature. By using the traceability matrix we can measure, when to stop testing of the project or application.

Generally Traceability Matrix contains:
1. UseCaseID (Functionality/Feature).
2. Description of the Feature.
3. Priority for the Feature.
4. TestCaseIDs for this Feature. (Once if the mapped testcases for each Feature meets Success criteria, then we can stop testing of the project)
5. In which phase is the Feature (Unit, Component, Integration, and System)

Regards,
Chaitanya.K
HPIT – CSN TCOE
IP IP Logged
cprasenjit26
Senior Member
Senior Member
Avatar

Joined: 14May2009
Location: India
Online Status: Offline
Posts: 151
Quote cprasenjit26 Replybullet Posted: 26May2009 at 10:43pm
One tool used in Requirements Management is a Traceability Matrix.
 
IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.156 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting