Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumSoftware Testing @ OneStopTestingTest Plans @ OneStopTesting

Message Icon Topic: Project Plans and IEEE 829

Post Reply Post New Topic
Author Message
sunita
Groupie
Groupie
Avatar

Joined: 26Mar2007
Online Status: Offline
Posts: 76
Quote sunita Replybullet Topic: Project Plans and IEEE 829
    Posted: 02Apr2007 at 2:08am

The 16 clauses of the IEEE 829 test plan standard are:
1. Test plan identifier.
2. Introduction.
3. Test items.
4. Features to be tested.
5. Features not to be tested.
6. Approach.
7. Item pass/fail criteria.
8. Suspension criteria and resumption requirements.
9. Test deliverables.
10. Testing tasks.
11. Environmental needs.
12. Responsibilities.
13. Staffing and training needs.
14. Schedule.
15. Risks and contingencies.
16. Approvals.
These can be matched against the five characteristics of a basic plan, with a couple left over that form part of the plan document itself.





Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.078 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting