Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumQuality Assurance @ OneStopTestingQuality Methodologies / Streams @ OneStopTesting

Message Icon Topic: Software Quality Assurance involvement

Post Reply Post New Topic
Author Message
tanushree
Senior Member
Senior Member
Avatar

Joined: 04Apr2007
Online Status: Offline
Posts: 2160
Quote tanushree Replybullet Topic: Software Quality Assurance involvement
    Posted: 29Oct2007 at 4:30am

 Software Quality Assurance involvement


The above V Model shows the optimum testing process, where test preparation commences as soon as the Requirements Catalogue is produced. System Test planning commenced at an early stage, and for this reason, the System test will benefit from Quality initiatives throughout the project lifecycle.

The responsibility for testing between the Project & Software Qualtiy Assurance (S.Q.A.) is as follows:

  • Unit Test is the responsibility of the Development Team
  • System Testing is the responsibility of SQA
  • User Acceptance Testing is the Responsibility of the User Representatives Team
  • Technology Compliance Testing is the responsibility of the Systems Installation & Support Group.



Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.984 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting