![]() |
![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() |
|
![]() ![]() |
Author | Message |
tanushree
Senior Member ![]() Joined: 04Apr2007 Online Status: Offline Posts: 2160 |
![]() ![]() ![]() Posted: 27Oct2007 at 5:50am |
V-model The V Model, while admittedly obscure, gives equal weight to testing rather than treating it as an afterthought. Initially defined by the late Paul Rook in the late 1980s, the V was included in the U.K.'s National Computing Centre publications in the 1990s with the aim of improving the efficiency and effectiveness of software development. It's accepted in Europe and the U.K. as a superior alternative to the waterfall model; yet in the U.S., the V Model is often mistaken for the waterfall. The V shows the typical sequence of development activities on the left-hand (downhill) side and the corresponding sequence of test execution activities on the right-hand (uphill) side. < ="text/"> < ="text/" ="http://pagead2.googlesyndication.com/pagead/show_ads.js"> In fact, the V Model emerged in reaction to some waterfall models that showed testing as a single phase following the traditional development phases of requirements analysis, high-level design, detailed design and coding. The waterfall model did considerable damage by supporting the common impression that testing is merely a brief detour after most of the mileage has been gained by mainline development activities. Many managers still believe this, even though testing usually takes up half of the project time. Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
![]() |
|
![]() ![]() |
||
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.