Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumSoftware Testing @ OneStopTestingTest Plans @ OneStopTesting

Message Icon Topic: Acceptance Test Plan {ATP}

Post Reply Post New Topic
Author Message
tanushree
Senior Member
Senior Member
Avatar

Joined: 04Apr2007
Online Status: Offline
Posts: 2160
Quote tanushree Replybullet Topic: Acceptance Test Plan {ATP}
    Posted: 15Oct2007 at 4:14am
Acceptance Test Plan {ATP}
The client at their place performs the acceptance testing. It will be very similar to the system test performed by the Software Development Unit. Since the client is the one who decides the format and testing methods as part of acceptance testing, there is no specific clue on the way they will carry out the testing. But it will not differ much from the system testing. Assume that all the rules, which are applicable to system test, can be implemented to acceptance testing also.

A sample Test Plan Outline along with their description is as shown below:

Test Plan Outline
1.   BACKGROUND – This item summarizes the functions of the application system and the tests to be performed.
2.   INTRODUCTION
3.   ASSUMPTIONS – Indicates any anticipated assumptions which will be made while testing the application.
4.   TEST ITEMS - List each of the items (programs) to be tested.
5.   FEATURES TO BE TESTED - List each of the features (functions or requirements) which will be tested or demonstrated by the test.
6.   FEATURES NOT TO BE TESTED - Explicitly lists each feature, function, or requirement which won't be tested and why not.
7.   APPROACH - Describe the data flows and test philosophy.
Simulation or Live execution, Etc. This section also mentions all the approaches which will be followed at the various stages of the test execution.
8.   ITEM PASS/FAIL CRITERIA Blanket statement - Itemized list of expected output and tolerances
9.   SUSPENSION/RESUMPTION CRITERIA - Must the test run from start to completion?
Under what circumstances it may be resumed in the middle?
Establish check-points in long tests.
10.   TEST DELIVERABLES - What, besides software, will be delivered?
Test report
Test software
11.   TESTING TASKS Functional tasks (e.g., equipment set up)
Administrative tasks
12.   ENVIRONMENTAL NEEDS
Security clearance
Office space & equipment
Hardware/software requirements
13.   RESPONSIBILITIES
Who does the tasks in Section 10?
What does the user do?
14.   STAFFING & TRAINING
15.   SCHEDULE
16.   RESOURCES
17.   RISKS & CONTINGENCIES
18.   APPROVALS
The schedule details of the various test pass such as Unit tests, Integration tests, System Tests should be clearly mentioned along with the estimated efforts. 



Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.344 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting