![]() |
![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() |
|
![]() ![]() |
Author | Message |
tanushree
Senior Member ![]() Joined: 04Apr2007 Online Status: Offline Posts: 2160 |
![]() ![]() ![]() Posted: 11Oct2007 at 12:13am |
Usage of the waterfall model
In Royce's original waterfall model, the following phases are followed perfectly in sequential order: Requirements specification Requirements are captured and set in stone. Design A "blueprint" is drawn up for the developers to implement. Implementation Integration Testing Installation Maintenance Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
![]() |
|
![]() ![]() |
||
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.