Active Topics Memberlist Calendar Search Help | |
Register Login |
One Stop Testing Forum : Software Testing @ OneStopTesting : Test Plans @ OneStopTesting |
Topic: Test Effort |
|
Author | Message |
vidhya
Senior Member Joined: 24Mar2007 Online Status: Offline Posts: 114 |
Topic: Test Effort Posted: 26Mar2007 at 5:18am |
Test Effort
The test effort shows the expenses for (still to come) tests. There is a relation with test costs and failure costs (direct, indirect, costs for fault correction). Some factors which influence test effort are: maturity of the software development process, quality and testability of the testobject, test infrastructure, skills of staff members, quality goals and test strategy. Methods for estimation of the test effortTo analyse all factors is difficult, because most of the factors influence each other. Following approaches can be used for the estimation: top-down estimation and bottom-up estimation. The top-down techniques are formula based and they are relative to the expenses for development: Function Point Analysis (FPA) and Test Point Analysis (TPA) amongst others. Bottom-up techiques are based on detailed information and involve often experts. The following techniques belong here: Work Breakdown Structure (WBS) and Wide Band Delphi (WBD). |
|
MBA Examination papers
Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
IP Logged | |
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.