Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumQuality Assurance @ OneStopTestingRequirements and Design Documents @ OneStopTesting

Message Icon Topic: Requirements Management Metrics

Post Reply Post New Topic
Author Message
vidhya
Senior Member
Senior Member


Joined: 24Mar2007
Online Status: Offline
Posts: 114
Quote vidhya Replybullet Topic: Requirements Management Metrics
    Posted: 26Mar2007 at 4:06am
 

Requirements Management Metrics

Requirements management can provide vital information. For example, by associating costs with requirements and using the data to estimate similar work, improvements in cost estimates are possible. The development processes must be stable enough to make the cost data comparable, however.

Some measures of the effectiveness of the requirements process include:

  • the status of each requirement
  • the cumulative number of changes (including the cumulative number proposed, open, approved, and incorporated into the baseline)
  • effort and funds expended
MBA Examination papers



Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 4.641 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting