Quote tanushree Replybullet Topic: Certificate In Software Testing Practice Exam
    Posted: 25Sep2007 at 11:47pm

Question

 

NOTE: Only one answer per question

1

We split testing into distinct stages primarily because:

a)     Each test stage has a different purpose.

b)     It is easier to manage testing in stages.

c)      We can run different tests in different environments.

d)     The more stages we have, the better the testing.

2

Which of the following is likely to benefit most from the use of test tools providing test capture and replay facilities?

a)     Regression testing

b)     Integration testing

c)      System testing

d)     User acceptance testing

3

Which of the following statements is NOT correct?

a)     A minimal test set that achieves 100% LCSAJ coverage will also achieve 100% branch coverage.

b)     A minimal test set that achieves 100% path coverage will also achieve 100% statement coverage.

c)      A minimal test set that achieves 100% path coverage will generally detect more faults than one that achieves 100% statement coverage.

d)     A minimal test set that achieves 100% statement coverage will generally detect more faults than one that achieves 100% branch coverage.

4

Which of the following requirements is testable?

a)     The system shall be user friendly.

b)     The safety-critical parts of the system shall contain 0 faults.

c)      The response time shall be less than one second for the specified design load.

d)     The system shall be built to be portable.

5

Analyse the following highly simplified procedure:

Ask: “What type of ticket do you require, single or return?”

IF the customer wants ‘return’

         Ask: “What rate, Standard or Cheap-day?”

         IF the customer replies ‘Cheap-day’

                   Say: “That will be £11:20”

         ELSE

                   Say: “That will be £19:50”

         ENDIF

  ELSE

         Say: “That will be £9:75”

  ENDIF

Now decide the minimum number of tests that are needed to ensure that all

the questions have been asked, all combinations have occurred and all

replies given.

a)     3

b)     4

c)      5

d)     6

6

Error guessing:

a)     supplements formal test design techniques.

b)     can only be used in component, integration and system testing.

c)      is only performed in user acceptance testing.

d)     is not repeatable and should not be used.

7

Which of the following is NOT true of test coverage criteria?

a)     Test coverage criteria can be measured in terms of items exercised by a test suite.

b)     A measure of test coverage criteria is the percentage of user requirements covered.

c)      A measure of test coverage criteria is the percentage of faults found.

d)     Test coverage criteria are often used when specifying test completion criteria.

8

In prioritising what to test, the most important objective is to:

a)     find as many faults as possible.

b)     test high risk areas.

c)      obtain good test coverage.

d)     test whatever is easiest to test.

9

Given the following sets of test management terms (v-z), and activity descriptions (1-5), which one of the following best pairs the two sets?

v  – test control

w – test monitoring

x  -  test estimation

y -  incident management

z -   configuration control

 

1 -   calculation of required test resources

2 -   maintenance of record of test results

3 -   re-allocation of resources when tests overrun

4 -   report on deviation from test plan

5 -   tracking of anomalous test results

 

a)     v-3,w-2,x-1,y-5,z-4

b)     v-2,w-5,x-1,y-4,z-3

c)      v-3,w-4,x-1,y-5,z-2

d)     v-2,w-1,x-4,y-3,z-5

10

Which one of the following statements about system testing is NOT true?

a)     System tests are often performed by independent teams.

b)     Functional testing is used more than structural testing.

c)      Faults found during system tests can be very expensive to fix.

d)     End-users should be involved in system tests.

11

Which of the following is false?

a)     Incidents should always be fixed.

b)     An incident occurs when expected and actual results differ.

c)      Incidents can be analysed to assist in test process improvement.

d)     An incident can be raised against documentation.

12

Enough testing has been performed when:

a)     time runs out.

b)     the required level of confidence has been achieved.

c)      no more faults are found.

d)     the users won’t find any serious faults.

13

Which of the following is NOT true of incidents?

a)     Incident resolution is the responsibility of the author of the software under test.

b)     Incidents may be raised against user requirements.

c)      Incidents require investigation and/or correction.

d)     Incidents are raised when expected and actual results differ.

14

Which of the following is not described in a unit test standard?

a)     syntax testing

b)     equivalence partitioning

c)      stress testing

d)     modified condition/decision coverage

15

Which of the following is false?

a)     In a system two different failures may have different severities.

b)     A system is necessarily more reliable after debugging for the removal of a fault.

c)      A fault need not affect the reliability of a system.

d)     Undetected errors may lead to faults and eventually to incorrect behaviour.

16

Which one of the following statements, about capture-replay tools, is NOT correct?

a)     They are used to support multi-user testing.

b)     They are used to capture and animate user requirements.

c)      They are the most frequently purchased types of CAST tool.

d)     They capture aspects of user behaviour.

17

How would you estimate the amount of re-testing likely to be required?

a)     Metrics from previous similar projects

b)     Discussions with the development team

c)      Time allocated for regression testing

d)     a & b

18

Which of the following is true of the V-model?

a)     It states that modules are tested against user requirements.

b)     It only models the testing phase.

c)      It specifies the test techniques to be used.

d)     It includes the verification of designs.

19

The oracle assumption:

a)     is that there is some existing system against which test output may be checked.

b)     is that the tester can routinely identify the correct outcome of a test.

c)      is that the tester knows everything about the software under test.

d)     is that the tests are reviewed by experienced testers.

20

Which of the following characterises the cost of faults?

a)     They are cheapest to find in the early development phases and the most expensive to fix in the latest test phases.

b)     They are easiest to find during system testing but the most expensive to fix then.

c)      Faults are cheapest to find in the early development phases but the most expensive to fix then.

d)     Although faults are most expensive to find during early development phases, they are cheapest to fix then.

21

Which of the following should NOT normally be an objective for a test?




Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.110 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting