![]() |
![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() |
|
![]() ![]() |
Author | Message |
varsha
Newbie ![]() Joined: 02Apr2007 Online Status: Offline Posts: 1 |
![]() ![]() ![]() Posted: 02Apr2007 at 11:41pm |
What is Software Architecture?
Def#1 The backbone of a software-intensive system or application, including its basic design, scalability and premise. Def#2 The software architecture of a program or computing system is the structure or structures of the system, which comprise software elements, the externally visible properties of those elements, and the relationships among them. Def#3 "Software architecture is the set of design decisions which, if made incorrectly, may cause your project to be cancelled." Edited by moderator - 04May2007 at 11:26pm Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
![]() |
|
karthi
Newbie ![]() ![]() Joined: 25Jun2007 Location: India Online Status: Offline Posts: 1 |
![]() ![]() ![]() |
how to develop a project entire sldc design with water fall model
|
|
need to know all testing activities &nbs
|
|
![]() |
|
vbob3
Newbie ![]() Joined: 17Aug2007 Online Status: Offline Posts: 1 |
![]() ![]() ![]() |
Hi,
First Thing we need to see while using Water fall model is, Wether we have clear requirements or not. If we have clear Requirements then we can go ahead and implement waterfall model. if we have clear requirements then, Phase 1 -- Initial Phase -- Requirements are gatered and baselined, so that no changes are maded in later stages. Phase 2 --- Analysis Phase --- Software Requirements and HARDWARE REQUIREMENTS & also RESOURCE REQUIREMENTS should be planned here. Phase 3 -- Design --- HLD -- High Level Design LLD-- Low Level Design Tech leads will prepare the HLD It will say abt the how the design flow Phase 4 ---Coding ------ Coding will be done based on the Desin (HLD & LLD) & the Requirements. Phase 5 ----- Testing--- Testing will be done based on the Requirements on the Code. Phase 6 ---- Delivery & Maintaninance Deliver of the Project or Product is planned & also Maintainance is also planned. ----------So thats how WaterFall model Works out--------- This model is an advantage model only if the Requirements are Baselined at the Phase 1. Edited by vbob3 - 17Aug2007 at 11:31pm |
|
![]() |
|
![]() ![]() |
||
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.