Topic: test effort Estimations industry standards Posted: 27Apr2007 at 1:52am |
Going through the forums i understand a bit of estimations now ,but still i do have some queries
1.When people say for full SDLC project the testing effort is about 30-35% percent of development effort .So in that 30 %of time is all testing included i.e Unit ,intergration ,system,performance and acceptance ) 2.How to estimate time for Knowledge transfer/transition or requirement familiarization .(Is this time is included in 30%) 3.Lastly i want to know the industry standards for the %time required for unit testing ,integration testing ,functional testing ,performance testing within that 30% time 4. Also the % time required for the activites like test case writing,execution,rework and review Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
IP Logged | |
Megha
Newbie Joined: 27Apr2007 Online Status: Offline Posts: 1 |
Posted: 27Apr2007 at 5:32am |
Going through the forums i understand a bit of estimations now ,but still i do have some
queries Quote: 1.When people say for full SDLC project the testing effort is about 30-35% percent of development effort .So in that 30 %of time is all testing included i.e Unit ,intergration ,system,performance and acceptance ) When I provide estimates for testing it is usually QA and UAT, and these are provided separately. I do not use the 30% but if I did it would be for those 2 items. Unit and integration testing, IMO, are part of the developer estimates. Quote: 2.How to estimate time for Knowledge transfer/transition or requirement familiarization .(Is this time is included in 30%) My estimates allow time for familiarization with the requirements. [quote[ 3.Lastly i want to know the industry standards for the %time required for unit testing ,integration testing ,functional testing ,performance testing within that 30% time 4. Also the % time required for the activites like test case writing,execution,rework and review |
|