Active TopicsActive Topics  Display List of Forum MembersMemberlist  CalendarCalendar  Search The ForumSearch  HelpHelp
  RegisterRegister  LoginLogin


 One Stop Testing ForumQuality Assurance @ OneStopTestingEstimation and Planning

Message Icon Topic: About Test Effort Estimation

Post Reply Post New Topic
Author Message
Anju
Newbie
Newbie
Avatar

Joined: 27Apr2007
Online Status: Offline
Posts: 1
Quote Anju Replybullet Topic: About Test Effort Estimation
    Posted: 27Apr2007 at 1:33am
Just curious about how effort estimations for projects are being carried out. I assume there is no single "standard" way of going about this. My assumption is there is no data from previous projects to fall back on.

I made a small list of the methods I've come across :
1. 40% of development time. Nobody knows where the magic 40 materialized from. Yet blind idolatry prevents a change in this figure upwards or downwards! ;-)

2. Use the FP figures with some modifications. usually comes to 90% of development time. Accuracy ranges from + or - 100% !

3. As long as it takes, until we run out of time or moolah ! ;-)

What method do you use - is there a method to the madness ?




Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.813 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting