Message Icon Topic: Testing Questions & Answers-Multiple Choice

Post Reply Post New Topic
Author Message
tanushree
Senior Member
Senior Member
Avatar

Joined: 04Apr2007
Online Status: Offline
Posts: 2160
Quote tanushree Replybullet Topic: Testing Questions & Answers-Multiple Choice
    Posted: 27Feb2008 at 11:46pm
Continued....

1. _________ categories of data will be collected during testing.


a. Two
b. Three
c. Four
d. Five

ANSWER : c


2. ______________ is normally a reverse of the test development process. In other words, it begins at the very lowest level and the results are rolled up to the highest levels.

a. Conducting testing
b. Resuming testing
c. Acceptance testing
d. None of the above


ANSWER : a

3. Which one is called as most common test report ?

a. Test Summary Report
b. Check List
c. Spreadsheet
d. Cause-Effect Graphing


ANSWER : c


4. Verification that the process deliverables/ phases are meeting the user’s true needs is called as

a. Inspections
b. Reviews
c. Acceptance testing
d. Acceptance criteria

ANSWER : b


5. _____________ the reporting process is very important because software tools are being upgraded, and manual supporting activities sometimes break down.

a. Analyzing
b. Monitoring
c. Both A & B
d. None of the above

ANSWER : b


6. _______________ report provides information related to a specific project component.

a. Individual Project Status Report
b. Major Project Status Report
c. Both A & B
d. None of the Above


ANSWER : b


7. ________________ report provides general information about all projects.

a. Individual Project Status Report
b. Major Project Status Report
c. Both A & B
d. None of the Above

ANSWER : d


8. The Project Status Report contains the project activities information and give a history of the project over a 16-month period.

a. True
b. False

ANSWER : a


9. The test reports are for use by the testers, the test manager, and the software development team.

a. True
b. False


ANSWER : a

10. _________ is a risk-oriented activity in which resources should be expended to minimize the major risks.

a. Testing
b. Development
c. Quality Control
d. Quality Assurance

ANSWER : a


12. _______________ measure the characteristics of the documentation and code.

a. Process metric
b. Product metric
c. Software quality metric
d. Software metric

ANSWER : b




Post Resume: Click here to Upload your Resume & Apply for Jobs

IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.078 seconds.
Vyom is an ISO 9001:2000 Certified Organization

© Vyom Technosoft Pvt. Ltd. All Rights Reserved.

Privacy Policy | Terms and Conditions
Job Interview Questions | Placement Papers | Free SMS | Freshers Jobs | MBA Forum | Learn SAP | Web Hosting